Description: towards existing OHSR at UC college and towards proposed OHSR at Manjali in Karumalloor GP Construction of 10 50 LL capacity OHSR at Manjali in Karumalloor GP General Civil Work Work Name KIIFB KIIFB Augmentation of WSS to Karumalloor and Kunnukara Panchayaths Augmentation of WSS to Karumallur and Kunnukara Panchayaths Phase 1 Package 3 Supplying laying charging and commissioning of 250 mm DI K9 Clear Water Pumping main towards existing OHSR at UC college and towards proposed OHSR at Manjali in Karumalloor GP Construction of 10 50 LL capacity OHSR at Manjali in Karumalloor GP General Civil Work
Details: Part I - Cost of materials - Supply and Laying 250mm dia. Clear water pumping main from Thadikkakadavu Bridge(N) to UC OHSR in Karumalloor GP 100.98.118:Supply of DI K9 Pipe Conforming to IS 8329/2000, 250mm Dia. 100.98.462:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 250mm. 100.98.115:Supply of DI K9 Pipe Conforming to IS 8329/2000, 100mm Dia. 100.98.163:Supply of HDPE Pipe PE 100 (IS 4984/1995), 10kg, 280mm Outer Dia. 100.98.460:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 150mm. 100.98.445:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Double Orifice Type DS2, Size 40mm. OD285950/2023-2024:Cost for DI specials OD285951/2023-2024:HDPE specials 5% of pipe cost Part 2 - Working charges - Supply and Laying 250mm dia. Clear water pumping main from Thadikkakadavu Bridge(N) to UC OHSR in Karumalloor GP 100.1.1:Excavating trenches of required width for pipes, c
Sector: Water supply and Sewerage