Description: Production Supply and Installation of Precast Box Culvert at NTECL Attipattu side approach road to NTECL Vallur Name of Work Production Supply Installation of Precast Box Culvert at NTECL Attipattu side approach road
Details: Filling the available good earth in trenches, plinth, sides of foundation, rain cuts, temporary bund, depressions, scouring of bund area etc in layers not exceeding 20cm depth and all lift including carriage of earth/ ash by mechanical transport including loading,unloading and stacking, watering, ramming by hand rammer including all labour, materials, tools and tackles etc complete and as per direction of Engineer ln charge for a lead up to 50 m (soil to be transported from soil stack) Earth work in excavation by mechanical means (Hydraulic excavator)/manualmeans over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge (Pond ash may be used for forming roads inside ash dyke so dump deployment has been deducted in DSR rate)-All kinds of soil Providing and laying in position cement concrete of specified grade excluding the cost of centering a
Sector: Power Sector