Description: Repairing of Water Supply System in Old Colony and New Colony of Loktak Project Name of Work Repairing of Water Supply System in Old Colony New Colony of Loktak Project
Details: Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc. External work 17.8.8 (80mm dia nominal bore) Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc.: 50mm dia nominal bore. Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. Internal work - Exposed on wall: (25 mm nominal outer dia Pipes) Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC
Sector: Generation