Description: SPL REPAIR TO ROAD IN 101 AREA UNDER GE SHILLONG Name of Work SPL REPAIR TO ROAD IN 101 AREA UNDER GE SHILLONG
Details: Material and labour for repair to potholes, not exceeding 1.00 Sqm each including sweeping free from dust and mud or water, scoring sunken surfaces in roads etc cutting around edges to at least 25mm in depth and making good by applying tack coat using paving bitumen (VG-10 Grade) @ 5 kg per 10 Sqm, putting in premixed bituminous macadam, well rammed and sealed with binder using paving bitumen (VG-30 Grade) @ 9.8 Kg per 10 Sqm, blinded with 0.09 Cum of stone chipping 6.3 mm size and again well rammed (including supply of premixed macadam, binder and chippings),depth of pothholes exceeding 30mm and rolled with 8 to 10 tonne power roller to uniform fair surfaces complete all as specified and directed. Material and labour for preparation of existing black top surfaces by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surface with gunny bags or compressed air to remove all loose, dirt, etc. complete all as specified and directe
Sector: Defense