Description: Reconstruction of Sukhjoda Nag Mandir Link Road Total Length 3 25 Km under Road Division Dumka for the year 2024 25 Name of Work Reconstruction of Sukhjoda Nag Mandir Link Road Total Length 3 25 Km under Road Division Dumka for the year 2024 25
Details: Clearing and Grubbing road land Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness.By Mechanical Means using DozerIn area of light jungleRCD-SoR-2.03 (i) A Dismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres(ii)Lime/ Cement concrete By Mechanical meansLime concrete, cement concrete grade M-10 and belowRCD-SoR-2.04 (i) I A Dismantling of Str
Sector: Road development