Description: Dismantling shifting re installation testing and calibration of 01 no 50MT capacity ASEC make road weighbridge from existing place to New proposed site at Karma Project under Kuju Area Name of the Work Contract No
Details: Foundation Bolt (12 inch x 3/2 inch with washer) Base Plate (600mmX350mmX25m) along with Drilling cutting etc. Insulation Pad Stopper and Bumper Mounting (Stud Bottom, Top Bottom, Bottom Bottum) Complete set of bolts with nuts washers (19mmx90mm, 120nos.) (12mmx40mm, 25nos.) (16mmx75mm, 40nos.) Dismantling of 50MT Road weighbridge Supply and fixing of 30 Te, cup and ball type loadcell Erection, commissioning, fixing and alignment etc. of 50 MT road weigh bridge (consisting cost of fixing welding, etc as required Testing, calibration etc. Cleaning, Testing and Adjusting of Cl weights (20Kg each) Transpotation, loading unloading of weighbrige plate ISMB-500 Girder and accessories.(a) Hiring of crane for loading & unloading. (b) Hiring of trailor (c ) skilled manpower (d )semi- skilled manpower Contractors profit Total impact of GST for the purpose of CTC
Sector: Mining