Description: Chemical cleaning of package boiler installed Name of Work Chemical cleaning of package boiler installed at Jaduguda
Details: BOILER CLEANING Chemical cleaning of package boiler installed at Jadugoda – 03 nos. (After dismantling of both side door and related valve and refitted in the same) inclusive of cost of material & labor charges. Cleaning boiler Tube & Shell through High Pressure Jet pump (Working pressure not less than 300 Kg/square cm
Sector: Mining