Description: Shifting of 4000GPM pump motor set of Purba face sump for 02 times due to decrease of water level of the sump and maintenance of the pump and its pipe line for smooth supply of water to workers colony under AMP Colliery Name of Work Shifting of 4000GPM pump motor set of Purba face sump for 02 times due to decrease of water level of the sump and maintenance of the pump and its pipe line for smooth supply of water to workers colony under AMP Colliery
Details: Dismantling and withdrawal of 4000 GPM pump motor set along with its starter and cable from their existing postion Transporting of the above pump motor set along with its starter and cable from their existing position to the lower side of the sump Installation of the pump motor set on wooden slipper with proper alignment including fitting of coupling belt and greasing and packing of the pump Dismantling, transporting and fitting of suction Dismantling, transporting and fitting of 12/10" dia MS nipple, 10" dia MS bend and 10" dia MS short piece in the delivery side of the pump Dismantling, transporting and fitting of 10" dia MS pipe in the delivery (14+13)= 27 Nos. Dismantling, transporting and fitting of 10" sluice valve and NR valve 02 set x 02 times. Dismantling, transporting and fitting of 10" dia sluice valve of 10"dia hose for jointing the delivery Fabrication and fitting of 10" dia bend Fabrication of 10" dia MS taper pipe for jointing in the delivery Shifting and laying of cab
Sector: Mining