Description: Shifting of 4000 GPM pump motor set of Jharna face sump as and when required 03 times for extraction of coal from the floor of the sump and other miscellaneous job related to pumping and pipe line of MOCP Patch under AMP Colliery Name of Work Shifting of 4000 GPM pump motor set of Jharna face sump as and when required 03 times for extraction of coal from the floor of the sump and other miscellaneous job related to pumping and pipe line of MOCP Patch under AMP Colliery
Details: Dismantling and withdrawal of 4000 GPM pump motor set along with its starter and cable from their existing position. Transporting of the above pump motor set along with its starter and cable to the proposed site of the sump. Installation of the pump motor set on wooden slipper with proper alignment including fitting of coupling belt and greasing and packing of the pump. Dismantling, transporting and fitting of suction. Dismantling, transporting and fitting of 10” dia MS nipple, 10” dia MS bend and 10” dia MS short piece in the delivery side of the pump. Dismantling, transporting and fitting of 10” dia MS pipe in the delivery 20 Nos. x 03 times = 60 Nos. Dismantling, transporting and fitting of 10” dia sluice valve and NR valve – (02 set x 03 times). Dismantling, transporting and fitting of 10” dia hose. Shifting and laying of cable from the starter to the motor. (65 Mtr. x 03 times). Fabrication and fitting of 10” dia MS taper pipe. Fabrication and fitting of 10” dia MS bend. Cutting a
Sector: Mining