Description: Repairing and fabrication of damaged dust suppression shelter of receiving hopper of Feeder Breaker No 1 of Phularitand AMP Colliery Name of Work Repairing and fabrication of damaged dust suppression shelter of receiving hopper of Feeder Breaker No 1 of Phularitand AMP Colliery
Details: Cutting & dismantling of damaged iron materials of dust saperassion shelter Cutting & dismantling of old iron materials for fabriction Loading & unloading of iron materials for cutting place to fabrication place Fabrication of Iron Materials (i) Joist size 200mm×100mm (4.500Mx04Nos.+6.00Mx02Nos.=30M@25.4Kg./m)=0.500MT(ii) Chanel size 150mm×75mm (3.00Mx04Nos.+6.00Mx04Nos.+2.00Mx02Nos.=40M@16.4Kg./m)=0.340MT(iii) M.S.Angle size 65mm×65mmx8mm (6.00mx8Nos.+5.00mx2Nos.=58m@7.7Kg./m)=0.437MT(iv) M.S. Sheet 10MM Plate (0.500mx0.175mx22Nos.=1.925M²@78.5Kg./M²)=0.700MT Replacing of damaged & worn-out CGI sheet for covering through providing & fixing Providing & fixing of "J" hook with cap washer Making & fixing of water spray system both side Total impact of GST for the purpose of CTC
Sector: Mining