Description: Supply Installation Testing and Commissioning of Electro Mechanical Works for WSS Lar Watlar Chuntwaliwar Stage 1st Part 2nd Under JJM Name of Work Supply Installation Testing and Commissioning of Electro Mechanical Works for WSS Lar Watlar Chuntwaliwar Stage 1st Part 2nd Under JJM
Details: Electro-mechanical equipments to be installed for Clear Water Sump at CWW Stage 2nd (for CWW Stage 1st ) Supply, Installation, Testing & Commissioning of Submersible Pumping Unit at an altitude of 1711m (AMSL) as per IS-8034 (2002) to be installed in clear water sump The specifications are as under PUMP: -Make =KSB/CRI/Kirloskar or equivalent reputed make Discharge = 13500-15000 GPH. Head Range =240-250 meterSpeed = Not more than 3000 RpmType of pump =radial/ Mixed flow.Type of fluid to be handled =clear water. (Rest Technical specifications as per Annexure "B" ) Fabrication, providing, fitting, and lowering of 100mm diaC Class column pipe conforming to IS: 1239 of length 3mtr into the Clear water Sump up to the desired depth; The
Sector: Water supply and Sewerage