Description: Regarding repair renovation of footpaths and making sitting arrangements in front of Old library and renovation of lawn near main gate Parking shed area Name of Work Regarding repair renovation of footpaths and making siutting arrangements in front of old library and renovatiuon of lawn near main gate parking shed area
Details: Regarding repair/renovation of footpaths and making siutting arrangements in front of old library and renovatiuon of lawn near main gate (parking shed area) filling available excavated earth (excludin rock) trenches,plinth,sides of foundationws etc in layers not exceediung 20cm in depth ,consolidating Each deposited layer by ramming and waterubg ,kead upoto 50m and lift upto 1.5 Earth work in excavation by mechinical means (hydrauliuc excavator ) manual means in foundation trenches or drains (not exceeding 1.5m in width or 10Sqm on plan),including dressing of sides and rammimg of bottoms, lift upto 1.5m, including getting out the excavated soiln and disposal of surplus excavated soil as directed vwith a lead of 50m all kind of soil providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -All work upto plinth level :1:3:6 (1cement :3 coarse sand (zone-III) derived from natural sources. Brick work with common burnt clay F.P.S
Sector: Science University