Description: Installation of the pump and accessories used for running at Coal face area Name of the Work Contract No
Details: Fabrication of the base for installation of pump motor set 2 skilled X 3 days 3 Unskilled X 3 days Electrode, Industrial gas etc. Fabrication of the suction pipe & the delivery pipe for the motor-pump along with the supply of the 3/4*6"(12 in numbers) HT nut blot used for suction pipe and 5/8*4" nut bolt(24 in numbers) Installation of the 250MM/300MM Foot valve/NRV in the suction/delivery line of the motor-pump set Shifting of the HT pump along with the motor and the base Supply and fixing of rubber packing of different size Supply of gland packing of different sizes 12MM/16MM/22MM Supply of the coupling bolt suitable for the rubber bush coupling in existing pump motor set along with suitable lock nut Supply of the NRV of size 12 inch(material of the NRV will be cast steel) Total impact of GST for the purpose of CTC
Sector: Mining