Description: Construction of 42 Nos Ventilation Stopping Through construction of RCC Slab in Seam No IV of 37L 21DE Panel and 14R 22LE Panel in UG at Umaria Colliery Umaria Sub Area Johilla Area Name of the Work Contract No
Details: Item Description/ Heading Groove cutting manually by using chised/pick-axe in solid coal/stone for foundation, manhole/duggi hole /pits and excavated material to be removed and stacked separately within 50 Mtr. distance. (In coal) Groove cutting manually by using chised/pick-axe in solid coal/stone for foundation, manhole/duggi hole /pits and excavated material to be removed and stacked separately within 50 Mtr. distance.(In Soft stone) Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.) For Sand : Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.) For Stone chips 20mm : Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.) For Cement : Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost fo
Sector: Mining