Description: Works of 11 0 4 KV S S Installation Additional TF in B Plan 2024 25 under EDD II Amroha Name of Work fo qr forj k k M f rh vejksgk esa fctusl Iyku 2024 25 kstuk ds vUrxZr 11 0 40 dsoh midsUn dh kerko f dk dk ZA
Details: Supply of following material including freight and insurance charges. Lugs for 250 KVA TF The following material for Erection/ Fixing & laying as per RESPO manual and as per direction to Supervising Engineer (complete in all respect). Its includes the cost of labour,T&P & safe cartage etc.required all acessaries for proper completion of work. 250 KVA Transformer LT XLPE Cable 1x400 sq. mm. Pipe Earthing of 250 KVA Transformers with all required material complete in all respect. 11/.40 KVA TF Plinth suitable upto 250 KVA as per RESPO Drawing with proper fancing 3500x3500x2200mm in frame (including plinth and fancing material). Dismantling of Old and used 100 KVA TF Received Back to store centre Joya.
Sector: Distribution