Description: AMC of Nitrogen Injection fire protection system NIFPS installed at various substations of Bina Project Name of the Work Contract No
Details: Part-A Supply of spares Nitrogen Cylinder, 10 cubic mtr capacity (withNitrogen) Heat Sensor-Sprinkler ( heat sensing part offire detector) regulator assembly fire detector assembly stem actuated valve non return valve Hose Pipe assembly,1/4 inch,1.25 mtr length Hose Pipe assembly,3/8 inch,0.9 mtr length Hose pipe assembly,3/8 inch,1.25 mtr length Pressure monitor switch assembly 4 core fire survival cable(1 qty=1 mtr) 220/110V DC Hooter(DC Fail) 220/110V DC Hooter(audio/visual) 3 way ball valve 2 way ball valve TCIV flange TCIV gasket G02 limit switch assembly G03 limit switch assembly G04 limit switch assembly G05 limit switch assembly G06 limit switch assembly 110V or 220V DC contactor(4 NO) 110V or 220V DC contactor(2 NO +2 NC) 110V or 220V DC latching contactor(4 NO) 110V or 220V DC push button type lamp manifold assembly Part B -Service Visit of technician for checking healthiness of installed NIFPS(1 job= 4 mandays in a year ) Preventive maintenance of NIFPS(1 job=6 mandays in a
Sector: Mining