Description: Renovation Finishing of ERP Building for shifting of staff from Admin Building to Tech Building Except toilet at ALTTC Ghaziabad Name of Work Renovation Finishing of ERP Building for shiffting of staff from Admin Building to Tech Building Except toilet at ALTTC Ghaziabad
Details: Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 manufactured sand derived from Recycled Concrete Aggregate (RCA) : 6 graded stone aggregate 20 mm nominal size Recycled Concrete Aggregate (RCA) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation leveling & dressing & finishing the top smooth. Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. a) Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.. a) In cement mortar Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping
Sector: Telecommunication