Description: 208 EDCE 2023 24 Name of Work Augmentation Earthing Fencing and Repairing of Plinth Distribution Transformers Under Business Plan 2024 25 in the area of EDC Etawah on Semi Turnkey basis
Details: Carriage of Following Materials from Store Center Kunera Etawah to site of work Under Business Plan 2024-25 through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. STP 55 Pole 11 Mtr. ACSR Weasel Conductor AB Conductor 3x95 Sqmm LT Cable 1x400 Sqmm 25 KVA Distribution Transfomer. 250 KVA Distribution Transfomer. Supply of following accessories. Connecting Clamp MS T/F Base Angle 11 Kv Pin Insulator with Pin Holding Clamp Top Channel 11 Kv Fuse Set Suspension Clamp Distribution Box 3 Phase Distribution Box Clamp Nut & Bolt Completion of following work with all accessories/material, cartage/carriage, T&P, and any other required work for Completion of works as per satisfaction of supervisory engineer. Laying Of LT Cable 1x400 Sqmm Construction of T/F plinth for 250 KVA of size 2x2x1.5 m on a padding 0.25M deep in ground
Sector: Distribution