Description: 71 2023 24 EDCR Increasing load capacity of overloaded Transformer and Construction of line etc under Business Plan 2024 25 EDD Milak Rampur Name of Work Increasing load capacity of overloaded Transformer construction of line etc under Business Plan 2024 25 EDD Milak Rampur
Details: Carriage of the following material from Store Centre, Rampur to work site including loading & unloading. MS Channal (Dropper) MS Channal (Top) MS Angle 75*75*6*2028 MM PCC 8.5 Long 11/0.4 KVA T/F 10 KVA 11/0.4 KVA T/F 63 KVA 11/0.4 KVA T/F 100 KVA 11/0.4 KVA T/F 250 KVA LT AB Cable(3x50+1x35+1x16) sq mm LT XLPE Cable 3*400 sq mm ACSR Weasal Conductor LT PVC Cable 3.5*150 sq mm LT PVC Cable 3.5*70 sq mm LT PVC Cable 3.5*400 sq mm other line material 11/0.4 KV 100 KVA T/F(Recived Back Site to Store) AI Scrap (Recived Back Site to Store) Dismantling of HT & LT connection & replace of follwoing capacity T/F from substation double poles/plinth by Healthy transformer(including connection) and loading and unloading with associated work at both ends within 70 kms. 100 KVA trasnformer Installing of Healty Transformer, connection HT & LT of follwoing capacity T/F at substation Single Pole/ double poles/plinth by Healthy transformer(including connection) and loading and unloading with associ
Sector: Distribution