Description: Strengthening of 11D 2nd AND 11D 3rd belt conveyor at LHCM 1 R VIIA seam 3N4 Incline J P Colly Name of Work Works And Services
Details: Heightening of structure at both side with the help of chain pulley block and fitting of extra channel with nut and bolt after necessary gas cutting at -11D(2) belt conveyor and proper aligning and grading of the same Transportation of 30 nos. 1000mm Bottom rollers, 3 nos. decking plate (1.5mX1.5m), 12mm plate (2mX2m), Oxygen and DA cylinder from surface to -11D/ 73L fitting of 30 nos. Bottom rollers after proper alignment of foot stools Fitting of decking plates at drive head and tail end Fitting of striking plate at discharge point after necessary fabrication Heighting of structure at both side with the help of chain pulley block and fitting of extra channel with nut and bolt after necessary gas cutting at -1lD(3) belt conveyor and proper aligning and grading of the same Transportation of 60 nos.1000mm Bonom rollers, 3 nos. decking plate (1.5mX1.5m), 12mm plate (2mX2m), Oxygen and DA cylinder from surface to -11D/77L Fitting of 60 nos. bottom rollers after proper alignment of foot
Sector: Mining