Description: Dismantling transportation installation commissioning and trial run including necessary fabrication jobs including civil works of one 800mm width 1x 75KW 550v PVC belt conveyor for a length of 60m in 1100 m of new incline along the incline Name of Work Works And Services
Details: PART A E&M WORKS Dismantling of -4FL belt at 40D(ie discharge(1.37MT), drive head including motor and gear box(6.5MT), tail end(0.87MT), 60 mtrs structure(3.17MT)) Transportation and Installation of 1x75KW, 550V, Drive Head unit Complete with Drive Drum, Driven Drum, Gear Box, Motor, Coupling, Bearing Block etc. after loading it on MUV. Transportation and Installation of Discharge Unit Complete with Cleaner after loading it on MUV. Transportation (manually and by MUV) and Installation of Tail-end Unit Complete, after loading it on MUV. Transportation and Installation of 60 meters of 800 mm belt structure, after loading it on MUV. Transporting, laying, lapping & jointing of 126 meters of 800 mm belting. Laying/placement of starter, ACB, cables and lock out devices and 80 mtr 70 sqmm armoured cable from -4FL/40D to proposed site . PART B CIVIL WORKS Recess cutting in stone Providing and laying in position cement concrete of specified grade excluding the cost of centering and shutterin
Sector: Mining