Description: Installation of 4R substation by transportation of Transformers VCBs and Cables to 4R in between 4CL and 4BL for CM Panel Trunk Road T5 in RV Seam of MIC Jhanjra Project Colliery Name of Work Works And Services
Details: PART A E&M WORKS After dismantling the scrap structure, cleaning the site at 4R in between 4CL and 4BL by MUV Transportation of one 6.6KV VCB, 300A and two nos. 550V ABBs,200A with mounting on platform from surface to 4CL/4R by MUV 30 mtr. 6.6KV/70sq.mm cable reorientation from 4CL/3R to 4CL/4R then charging VCB at 4CL/4R 270mtr 6.6KV/70sqmm cable reorientation and hanging Loading, transportion and unloading one 6.6kv/550V 315KVA transformer Kirloskar make with its controlling VCB from 4CL/12R to 4CL/4R Loading, transportion and unloading one 6.6kv/550V 315KVA transformer Mine Line make with its controlling VCB from 4CL/12R Loading, transportation and unloading of 3nos. 550v ACBs Pulling, loading and unloading of 7 nos. VCBs from 4CL/12R to 4CL/4R Cable reorientation, hanging and connections of transformer and VCBs as mentioned in above Cable handling and trunking all 6.6KV VCBs PART B CIVIL WORKS Recess cutting in stone Providing and laying in position cement concrete of specified g
Sector: Mining