Description: Construction of Six 06 nos Earth Pit at 6 6KV main surface substation of 3N4 Incline J P Colly Name of Work Works And Services
Details: GI pipe 4" diameter Bentonite (25 kg bag) Salt (25 kg bag) Charcoal (25 kg bag) GI plate (600x600x6) GI flat (32X6) 60 mtr. Earth work in excavation of eath pit (1.5Mx1.5Mx3.5M)=7.875 Cu.M x 6 earth pits = 47.25 Cu.M Brick work (1:6) (6M x 0.25 x0.3M) =0.45 Cu.M x 6 earth pits = 2.7 Cu.M PCC of Brick work (1:2:4) (3 x 6M x0.075Mx0.3M) =0.405 Cu.M x 6 earth pits = 2.43 Cu.M Sand filling (3.5M x 1.5 x1.5M) =7.875 Cu.M x 6 earth pits = 47.25 Cu.M Earth pipe installation and connection GI flat laying, fitting and connection Total impact of GST for the purpose of CTC
Sector: Mining