Description: Installation of one no 1 MVA 3 3 kV 550V TSU at 8XD old Substation at R VIIA of 3and4 Incline J P Colly Name of Work Works And Services
Details: Manually pulling of 3.3 kV/550V TSU from 7L/-4D to 9L/4MD with the help of chain pulley block Transportation of 3.3 kV/550V TSU through haulage from 9L/4MD to 8XD/4MD Manually pulling of 3.3 kV/550V TSU from 8XD/4MD to 8XD(old) substation with the help of chain pulley block Laying of 500 mtr. or 2 reel 6.6 kV grade 70 sq.mm PVCDWA cable from surface substation to 9L along 3MD Manually pulling of 500 mtr. 6.6 kV grade 70 sq.mm PVCDWA cable from 46L/2XD to 32L/4XD haulage line Loading, transportation & unloading of 500 mtr. or 02 reels 6.6 kV grade 70 sq.mm PVCDWA cable from 32L/4XD to 9L/4MD with help of haulages Laying of 500 mtr. 6.6 kV grade 70 sq.mm PVCDWA cable from 9L to 8XD (old) substation along 3MD Hanging of 1000 mtr. or 4 reel 6.6 kV grade 70 sq.mm PVCDWA cable from surface to 8XD(old) substation Total impact of GST for the purpose of CTC
Sector: Mining