Description: M o Completed Scheme of Nazul A C II under South Zone Sub Head Providing Water treatment plant using Sand Filter and softener including 2 nos bore wells and connecting G I Pipeline to UGR at A 14 Kalkaji Extension Specialized Work Name of Work M o Completed Scheme of Nazul A C II under South Zone Sub Head Providing Water treatment plant using Sand Filter and softener including 2 nos bore wells and connecting G I Pipeline to UGR at A 14 Kalkaji Extension Specialized Work
Details: Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools,plants & machineries required for the job, all complete as per direction of Engineer-in-charge, upto 90 metre depth below ground level. All types of soil 300 mm dia. Rockey strata including Boulders Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer -in-charge, beyond 90 metre & upto 150 metre dept
Sector: Urban Authority