Description: Improvement of footpath drain and road along metro corridor from Metro Pier no 822 to 804 and road between Pier no 822 to P 6 on grey line near Dwarka metro station in Sector 16 a and b Dwarka Name of work M o various colonies under Nazul A C II Dwarka Zone Sub Head Improvement of footpath drain and road along metro corridor from Metro Pier no 822 to 804 and road between Pier no 822 to P 6 on grey line near Dwarka metro station in Sector 16 a b Dwarka
Details: Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles above 25 mm and up to 40 mm Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) Dismantling of old S.W. pipes including breaking of join
Sector: Urban Authority