Description: Covering of Ramp at the entry and exit of Basement from top and sides Name of Work C o 1568 DU s 600 Cat II 312 DU s 2 BHK 288 DU s 1 BHK and 968 EWS Multistoried Composite Houses Including internal development and Electrification in Pocket 5 Sector 14 Dwarka Phase II Sub Head Covering of Ramp at the entry and exit of Basement from top and sides
Details: Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.(a) Hot finished welded type tubes Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Providing and fixing Multi-wall Poly-carbonate sheet (16 mm thick) roofing upto any pitch including cutting sheets to size and shape wherever required, aluminium connectors, self drilling screws and EPDM washers etc. complete (excluding the cost of purlins, rafters and trusses etc.) as per direction of engineer-in-charge. Painting on G.S. sheet with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :(a) New work (two or more coats) inc
Sector: Urban Authority