Description: Desilting of Storm water drains in Sector 8 Dwarka Name of Work M o various colonies under Nazul A c II Dwarka Zone Sub Head Desilting of Storm water drains in Sector 8 Dwarka
Details: Cleaning and desilting of open & covered storm water drains of any width and depth, including taking out wet/semi-wet sludge, silt, malba, rubbish etc. (including any dead animal etc.) and disposal of the excavated material (wet/semi-wet sludge, silt, malba, rubbish etc) for all lead and all lift/depth and opening of drain cover and placing covers in position after desilting/cleaning the drains, removal of the blockage, cleaning of bell mouth, obstructions in the smooth flow of drain in or under water/liquid mud in foul condition. All complete as per direction of Engineer-in-charge.
Sector: Urban Authority