Description: Performance based Maintenance Contracts PBMC Estimate of Rehabilitation and up gradation of Nandgaon peth Morshi Warud MHMP border section of Nh353 K Design km 0 000 to 95 390 to Two Four Lane with Paved shoulders Configuration of NH353 K for Name of Work Performance based Maintenance Contracts PBMC Estimate of Rehabilitation and up gradation of Nandgaon peth Morshi Warud MH MP border section of NH 353 K Design km 0 000 to 95 390 to Two Four Lane with Paved shoulders Configuration of NH 353 K for 5 year Maintenance Period in the state of Maharashtra
Details: Routine Work Routine Maintenance For two lane Carriageway Routine Maintenance For Four lane Carriageway Initial work Crack Sealing/Filling using epoxy mortar: Base and hardener of the high strength repair mortar . Epoxy putty shall be mixed using the slow speed heavy duty mixing machine to obtain a uniform mix. The mixed materials shall be placed all along the prepared "V" groove and finished smoothly using the putty blade/trowel within 30 minutes by using the divers. The finished surface shall be allowed for curing minimum of 24 hours to attain the strength. The item includes the cost of hire charges of all equipment, tools and plants and all labour charges etc., complete. Stapling as per specifications and standards defined in IRC SP:83-2018 Cross- Stitching as per specifications and standards defined in IRC SP:83-2018 Dressing of side shoulder/Scrapping the road side shoulder by Mechanical means(By JCB/DOUZER) including excavation of raised side shoulders up
Sector: Road development